Next phase of the upper level construction is underway.
Dual track main and single track branch are being extended along the long back wall and around one of the side walls. This adds room for the town of New Utrecht with a small industrial area, a coal mine, train station and a small downtown area.
The photos below just show the progress of test fitting the track and the foot prints for structures.
Next steps are:
1. Marking the plywood, laying cork roadbed, laying track, powering the track and testing.
2. Since there will be a hill in the corner behind the coal mine I will need to add backdrops and the hill after I finish with the trackwork. Along with construction of the coal mine. Long reach in distance to the corner where the hill will be located so this one section of scenery will be added early. The reach in distance to the farthest track is 21 inches from the edge of the benchwork.
3. Mount turnout motors and test again.
Small industrial district with three manufacturing companies. Box cars parked at sidings and a short freight waiting to enter the main from the branch.