Monday, June 29, 2020

I added about 20 feet to the upper level that extends the dual track mainline from the arrival and departure tracks of Fuhgeddaboudit Yard.

A branch line splits from the main and will eventually be extended to a coal mine and a couple of industrial areas on the upper level.  The main will begin its descent to the lower level.

A few short videos.  Pennsy 6-8-6 steam turbine #6200 moving from right to left leaving the yard and entering the main.  UP 4-12-2 #9019 entering the yard from the main.  Also a pan of the yard with the classification tracks along the wall and the loco servicing area in front.

In case any of you notice my temporary power distribution wiring I modelled it after wiring I saw in Havana, Cuba last year.  See the photo of the typical Havana building power entrance wiring at the end of this update.








No comments:

Post a Comment